* Establish a cadence and synchronize work on that cadence. Done correctly the cadence will naturally mean that you cannot take on too much work (although note that people / teams will still over-commit.) | * Establish a cadence and synchronize work on that cadence. Done correctly the cadence will naturally mean that you cannot take on too much work (although note that people / teams will still over-commit.) | ||
* As it is visible, set limits on how much WIP you are willing to take on for this stage. Note that setting a WIP to be the "same as the number of people in the team" just hides the problem - you need to set up a lower constraint so that people really start concentrating on flow. | * As it is visible, set limits on how much WIP you are willing to take on for this stage. Note that setting a WIP to be the "same as the number of people in the team" just hides the problem - you need to set up a lower constraint so that people really start concentrating on flow. | ||
- | * Aggressively triage the work. See [[blog:how_do_we_deal_with_product_backlog_explosion|How Do We Deal With Product Backlog Explosion? | + | * Aggressively triage the work. See [[how_do_we_deal_with_product_backlog_explosion|How Do We Deal With Product Backlog Explosion? |
* Ruthlessly prioritize at all levels. Too much WIP at the program level has a tendency to result in too much WIP at the team level. | * Ruthlessly prioritize at all levels. Too much WIP at the program level has a tendency to result in too much WIP at the team level. | ||
* Only commit when it means something. For example, if you are about to start some work, but have a dependency on another who is not able to do their part for a long time, it makes no sense to start your work now. | * Only commit when it means something. For example, if you are about to start some work, but have a dependency on another who is not able to do their part for a long time, it makes no sense to start your work now. |