We should watch this number carefully and ask, for example, whether this interruption User Story really needed to be dealt with during this Sprint | We should watch this number carefully and ask, for example, whether this interruption User Story really needed to be dealt with during this Sprint | ||
or could have waited to the next. If it happens a lot perhaps the Team should considered shorter Sprints so they are more responsive to the business, for example. In other words, it allows the team to have more planned work. | or could have waited to the next. If it happens a lot perhaps the Team should considered shorter Sprints so they are more responsive to the business, for example. In other words, it allows the team to have more planned work. | ||
- | |||
- | ~~LINKBACK~~ | ||
- | ~~DISCUSSION~~ | ||
{{tag> | {{tag> |
/home/hpsamios/hanssamios.com/dokuwiki/data/attic/track_adopted_work_metric.1466100619.txt.gz · Last modified: 2020/06/02 14:24 (external edit)